thank you for your understanding in this matter
RECO specializes in compressed air equipment rental and service. Our goal is to build strong reliable partners through our commitment to excellence and value. We are here for you 24/7 to meet whatever need you may have.
The individual triangles comprising the yield line should have a base of 12 to 24 inches wide and a height equal to 1.5 times the base. Support: 06 If a bicycle lane is marked on the outside portion of the traveled way, the edge line that would mark the outside edge of the bicycle lane may be omitted. Flashing raised pavement markers are considered to be In-Roadway Lights (see. Option: New marked crosswalks alone, without other measures designed to reduce traffic speeds, shorten crossing distances, enhance driver awareness of the crossing, and/or provide active warning of pedestrian presence, should not be installed across uncontrolled roadways where the speed limit exceeds 40 mph and either: Chapter 4F contains information on Pedestrian Hybrid Beacons. The minimum taper length should be 100 feet in urban areas and 200 feet in rural areas. Non-retroreflective raised pavement markers should not be used alone, without supplemental retroreflective or internally illuminated markers, as a substitute for other types of pavement markings. Support: Revised MUTCD Maintaining Minimum Pavement Marking Retroreflectivity The longitudinal spacing of the chevrons or diagonal lines should be determined by engineering judgment considering factors such as speeds and desired visual impacts. 01 Center line pavement markings, when used, shall be the pavement markings used to delineate the separation of traffic lanes that have opposite directions of travel on a roadway and shall be yellow. Section 11-307 of the "Uniform Vehicle Code (UVC)" contains further information regarding required road user behavior in no-passing zones. 03 Raised pavement markers also may be used to supplement other markings such as channelizing islands, gore areas, approaches to obstructions, or wrong-way arrows. To submit a request, send an e-mail to DOT.HwyStds@illinois.gov. Other markings, such as white delineators, white channelizing devices, white raised pavement markers, and white crosswalk markings may also be placed in the flush median area. The UVC can be obtained from the National Committee on Uniform Traffic Laws and Ordinances at the address shown on Page i. Solid lines shall not be used to extend edge lines into or through intersections or major driveways. IDOT documents are best viewed using Internet Explorer. This website utilizes varied software, media tools, files and applications to present or make available varied information. Standard: When paved shoulders of sufficient width are available, the speed measurement markings may be placed entirely on these shoulders (see Drawing A of. On three-lane roadways where the direction of travel in the center lane transitions from one direction to the other, a no-passing buffer zone shall be provided in the center lane as shown in. Where lane changes might cause conflicts, a wide or normal solid white lane line may extend upstream from an intersection. Option: Guidance: See, Pavement markings shall be used to guide traffic away from fixed obstructions within a paved roadway. Lane line markings should also be used at congested locations where the roadway will accommodate more traffic lanes with lane line markings than without the markings. Standard: The "Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG)" (see, Marking of parking space boundaries encourages more orderly and efficient use of parking spaces where parking turnover is substantial. Approach markings for bridge supports, refuge islands, median islands, toll plaza islands, and raised channelization islands shall consist of a tapered line or lines extending from the center line or the lane line to a point 1 to 2 feet to the right-hand side, or to both sides, of the approach end of the obstruction (see, For roadways having a posted or statutory speed limit of 45 mph or greater, the taper length of the tapered line markings should be computed by the formula L = WS. Support: If used, stop and yield lines should be placed a minimum of 4 feet in advance of the nearest crosswalk line at controlled intersections, except for yield lines at roundabouts as provided for in, Stop lines at midblock signalized locations should be placed at least 40 feet in advance of the nearest signal indication (see, If yield or stop lines are used at a crosswalk that crosses an uncontrolled multi-lane approach, the yield lines or stop lines should be placed 20 to 50 feet in advance of the nearest crosswalk line, and parking should be prohibited in the area between the yield or stop line and the crosswalk (see, If yield (stop) lines are used at a crosswalk that crosses an uncontrolled multi-lane approach, Yield Here To (Stop Here For) Pedestrians (R1-5 series) signs (see. Support: 14 Yield (stop) lines and Yield Here To (Stop Here For) Pedestrians signs should not be used in advance of crosswalks that cross an approach to or departure from a roundabout. 10 The spacing of raised pavement markers used to supplement or substitute for other types of longitudinal markings should correspond with the pattern of broken lines for which the markers supplement or substitute. Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "04/27/2023","04/28/2023",094-91629,5,0.00%,0.00% . When crosswalk lines are used, they shall consist of solid white lines that mark the crosswalk. 08 Sections 11-301(c) and 11-311(c) of the "Uniform Vehicle Code (UVC)" contain information regarding left turns across center line no-passing zone markings and paved medians, respectively. 07 When substituting for wide lines, raised pavement markers may be placed laterally adjacent to each other to simulate the width of the line. areas, aggregate shoulders, temporary pavement marking, recessed reflective pavement marking, and other items to complete the project. Center line markings should also be placed on all rural arterials and collectors that have a traveled way of 18 feet or more in width and an ADT of 3,000 vehicles per day or greater. 01 If speed hump markings are used, they shall be a series of white markings placed on a speed hump to identify its location. 29 Wide solid lane line markings may be used for greater emphasis. 04 On freeways and expressways, the spacing may be increased to 3N for relatively straight and level roadway segments where engineering judgment indicates that such spacing will provide adequate delineation under wet night conditions. Figure 3B-12 Example of Solid Double White Lines Used to Prohibit Lane Changing. 02 When center line markings are used, no-passing zone markings shall be used on two-way roadways at lane-reduction transitions (see Section 3B.09) and on approaches to obstructions that must be passed on the right (see Section 3B.10). Placement of thermoplastic, epoxy, and polyurea pavement markings shall only be performed by contractors approved by IDOT's Engineer of Operations. IDOT maintains a list of contractors who are currently approved to perform this work.. On two-way, two- or three-lane roadways where center line markings are installed, no-passing zones shall be established at vertical and horizontal curves and other locations where an engineering study indicates that passing must be prohibited because of inadequate sight distances or other special conditions. Where greater restriction is required, solid lane lines or channelizing lines should be extended into or continued through intersections or major driveways. 01 When used, lane line pavement markings delineating the separation of traffic lanes that have the same direction of travel shall be white. 04 Curb markings without word markings or signs may be used to convey a general prohibition by statute of parking within a specified distance of a stop sign, YIELD sign, driveway, fire hydrant, or crosswalk. Guidance: 04 Except as provided in Section 8B.28, stop lines shall not be used at locations where drivers are required to yield in compliance with a YIELD (R1-2) sign or a Yield Here To Pedestrians (R1-5 or R1-5a) sign or at locations on uncontrolled approaches where drivers are required by State law to yield to pedestrians. An arrow at the downstream end of a turn lane can help to prevent wrong way movements. Guidance: 15 If used, the diagonal or longitudinal lines should be 12 to 24 inches wide and separated by gaps of 12 to 60 inches. This 2022 report provides technical guidance on methods for maintaining pavement marking retroreflectivity in accordance with the MUTCD. IDOT Driveway Permits 21 Alleys 23 On-Street Parking and Loading Areas 23 . or Alteration (FAA Form): FAA 7460-1, Revenue-Generating Facility Eligibility Evaluation Form (FAA), Detailed Project Justi&cation/Description, Airport Snow Removal Equipment Inventory Sheet, Apron Size Calculations for Transient Aircraft, Guide for Justifying Snow Removal Equipment Buildings (December 2011). A wide dotted white lane line shall be used: Lane drop markings used in advance of lane drops at freeway and expressway exit ramps should begin at least 1/2 mile in advance of the theoretical gore. The lane drop marking should begin no closer to the intersection than the most upstream regulatory or warning sign associated with the lane drop. 17 The yield-ahead triangle symbol or YIELD AHEAD word pavement marking shall not be used unless a YIELD sign (see Section 2B.08) is in place at the intersection. 0000568712 00000 n Edge line markings may be excluded, based on engineering judgment, for reasons such as if the traveled way edges are delineated by curbs, parking, or other markings. Anyone, 5 years of age and older, is eligible to receive the COVID-19 vaccine. Improvements on Interstate 55 include pavement resurfacing and patching, shoulder maintenance and culvert repairs. Standard: Support: 22 An additional arrow or arrows may be used in a turn lane. The space between the triangles should be 3 to 12 inches. Guidance: Center line markings should also be placed on other traveled ways where an engineering study indicates such a need. The design of the lines and gaps should avoid the wheel paths if possible, and the gap between the lines should not exceed 2.5 times the width of the diagonal or longitudinal lines. The spacing for such applications should be 2N, where N equals the length of one line segment plus one gap (see. Examples of standard word and arrow pavement markings are shown in Figures 3B-23 and 3B-24. The bidirectional marker is capable of displaying the applicable color for each direction of travel. When an exclusive pedestrian phase that permits diagonal crossing of an intersection is provided at a traffic control signal, a marking as shown in. Support: Guidance: 10 Where the curbs of the islands become parallel to the direction of traffic flow, it is not necessary to mark the curbs unless an engineering study indicates the need for this type of delineation. The contract details above are for informational purposes only until the Plans and Special . If advance markings are used, they shall comply with the detailed design shown in. Context Sensitive Solutions (CSS) - Aeronautics Implementation Procedures - May 2007.pdf, Locally Let Project and Local Procurement Guidance - AB 2013-02 .pdf, Sponsor Guidance for Local Let Projects at Primary Airports.pdf, 2016 ITEP Application Example - Form OPP-2245.pdf, Context Sensitive Solutions (CSS) - BLR Implementation Procedures - May 2007.pdf, Context Sensitive Solutions (CSS) - Departmental Policy D&E 21.pdf, Corps of Engineers Wetlands Delineation Manual 1987.pdf, Erosion and Sediment Control Field Guide for Construction Inspection.pdf, Highway Jurisdiction Guidelines Booklet.pdf, IDOT Guidance Photographing Historic Structures.pdf, IDOTs Acronyms: Its Like Trying to Read a Bowl of Alphabet Soup?! The new provisions in this final rule will be incorporated into Revision 3 of the 2009 edition of the MUTCD. 14 Lane drop markings used in advance of lane drops at freeway and expressway exit ramps should begin at least 1/2 mile in advance of the theoretical gore. City of Chicago Street and Site Plan Design Standards April 2007 ii . 03 On roadways without continuous center line pavement markings, short sections may be marked with center line pavement markings to control the position of traffic at specific locations, such as around curves, over hills, on approaches to grade crossings, at grade crossings, and at bridges. 18 The International Symbol of Accessibility parking space marking (see Figure 3B-22) should be placed in each parking space designated for use by persons with disabilities. Figure 3B-14 Examples of Applications of Lane-Reduction Transition Markings. 01 Speed reduction markings (see Figure 3B-28) are transverse markings that are placed on the roadway within a lane (along both edges of the lane) in a pattern of progressively reduced spacing to give drivers the impression that their speed is increasing. 01 Chevron and diagonal crosshatch markings may be used to discourage travel on certain paved areas, such as shoulders, gore areas, flush median areas between solid double yellow center line markings or between white channelizing lines approaching obstructions in the roadway (see Section 3B.10 and Figure 3B-15), between solid double yellow center line markings forming flush medians or channelized travel paths at intersections (see Figures 3B-2 and 3B-5), buffer spaces between preferential lanes and general-purpose lanes (see Figures 3D-2 and 3D-4), and at grade crossings (see Part 8). Figure 3B-20 Example of Crosswalk Markings for Exclusive Pedestrian Phase That Permits Diagonal Crossing. If diagonal or longitudinal lines are used without transverse lines to mark a crosswalk, the crosswalk should be not less than 6 feet wide. Figure 3B-25 Examples of Elongated Route Shields for Pavement Markings. Download the entire Local Roads Manual or to view the manuals by part please navigate to LPA Resources: Local Roads and Street Manual. 09 Retroreflective solid white markings should be used when traffic is permitted to pass on either side of the island. If used, right edge line pavement markings shall consist of a normal solid white line to delineate the right-hand edge of the roadway. Center line markings shall also be placed on all paved two-way streets or highways that have three or more lanes for moving motor vehicle traffic. Standard: Article 8.3.9 Advance Guide I-Pass or Pay Online with 15 MPH Signs (Illustrations AET-IT13 . At locations controlled by traffic control signals or on approaches controlled by STOP or YIELD signs, crosswalk lines should be installed where engineering judgment indicates they are needed to direct pedestrians to the proper crossing path(s). Center line markings should also be placed on all rural arterials and collectors that have a traveled way of 18 feet or more in width and an ADT of 3,000 vehicles per day or greater. Illinois Tollway Standard Drawings in PDF Format (Updated 03/2023) Section A - Roadway Pavement Section B - Drainage Section C - Guardrail Section D - Roadway Section E - MOT Section F - Sign Structure Section G - Structural Section H - Roadway Lighting Section K - Erosion Control and Landscape Section L - Fiber Optic IDOT documents are best viewed using Internet Explorer. 01 Marking of parking space boundaries encourages more orderly and efficient use of parking spaces where parking turnover is substantial. Curbs at openings in a continuous median island need not be marked unless an engineering study indicates the need for this type of marking. multi-lane freeway pavement marking (2 sheets) district one typical pavement markings detour signing for closing state highways . If N is other than 40 feet, the markers shall be equally spaced over the line segment length (at 1/2 points for three markers, at 1/3 points for four markers, and at 1/4 points for five markers). Option: Standard: Raised pavement markers also may be used to supplement other markings such as channelizing islands, gore areas, approaches to obstructions, or wrong-way arrows. 08 Except for the two opposing arrows of a two-way left-turn lane marking (see Figure 3B-7), the longitudinal space between word or symbol message markings, including arrow markings, should be at least four times the height of the characters for low-speed roads, but not more than ten times the height of the characters under any conditions. A single-direction lane-use arrow shall not be used in a lane bordered on both sides by yellow two-way left-turn lane longitudinal markings. 04 Additional parking space markings for the purpose of designating spaces for use only by persons with disabilities are discussed in Section 3B.20 and illustrated in Figure 3B-22. Center line markings shall also be placed on all paved two-way streets or highways that have three or more lanes for moving motor vehicle traffic. 19 A blue background with white border may supplement the wheelchair symbol as shown in Figure 3B-22. When supplementing double line markings, pairs of raised pavement markers placed laterally in line with or immediately outside of the two lines should be used. 05 Channelizing lines at exit ramps as shown in Figures 3B-8 and 3B-10 define the neutral area, direct exiting traffic at the proper angle for smooth divergence from the main lanes into the ramp, and reduce the probability of colliding with objects adjacent to the roadway. Please utilize the search function to locate items of interest. Center line pavement markings, when used, shall be the pavement markings used to delineate the separation of traffic lanes that have opposite directions of travel on a roadway and shall be yellow. Lane line markings should be discontinued one-quarter of the distance between the Lane Ends sign (see, Pavement markings at lane-reduction transitions supplement the standard signs. In this case, if the right-most exit lane is an added lane such as a parallel deceleration lane, the lane drop marking should begin at the upstream end of the full-width deceleration lane, as shown in Drawing C of Figure 3B-8. The "Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG)" (see Section 1A.11) contains specifications for design and placement of detectable warning surfaces. Company Name. Wide solid edge line markings may be used for greater emphasis. Issued by FHWA. The following are the reference materials for executing an agreement for airport related work, 2023 Illinois Highway Standards for Traffic Control, 2022 Illinois Highway Standards for Traffic Control, Work Zone Safety and Mobility Supplemental Policy, Positive Protection of Workers, Drop-offs and Temporary Concrete Barrier: 4-21, Standard Specifications / Supplemental Specifications and Recurring Special Provisions, Documentation of Contract Quantities Guide, CMMS Supplement Documentation of Contract Quantities Guide, Concrete Structures Other Than Bridge Decks, Hot Mix Asphalt (HMA) Binder and Surface Course, Hot Mix Asphalt (HMA) Pavement (Full Depth), Removal and Disposal of Regulated Substances, Stabilized Subbase, BAM, CAM, PAM & CAM II, LPA Resources: Local Roads and Street Manual, Illinois Supplement to the National Manual on Uniform Traffic Control Devices, Illinois Supplement to the National MUTCD Summary of Changes, Project Procedure Guide Sampling Frequencies for Materials Testing and Inspection, MISTIC Pay Item/Material Conversion Factor Report, Final Rule on Work Zone Safety and Mobility, Quality Standard for Work Zone Traffic Control Devices, Agreement on Accuracy of Plan Quantities (English): BC 981, Agreement on Accuracy of Plan Quantities (Metric): BC 981m, Assignment of Contract/Consent to Assignment of Contract: BC 503, Authorization of Contract Changes: BC 22 (Excel), Bidders Employee Utilization Form: BC 1256, Bituminous Paving Daily Record (metric): BC 2529M, Checklist for Engineer's Final Payment Estimate: BC 111, Construction Manual Corrections & Comments: BC 2371, Consultant Engineer's Private Vehicle Weekly Mileage Record: BC 931, Consultant Engineer's Weekly Personnel and Vehicle Time Distribution Record: BC 930, Contractor's Performance Evaluation: BC 1777, Final Inspection Report of State Road Work: BC 71, Local Agency Certification to Accompany Engineer's Final Payment Estimate: BC 608, Local Public Agency Construction Inspector: BC 776, Local Public Agency Resident Construction Supervisor/ In Responsible Charge: BC 775, Notice of EEO Policy & EEO Officer: BC 955, NPDES/Erosion Control Inspection Report: BC 2259, Prior Approval Authorization of Contract Change: BC 2256, Profile Report for Bridge Deck Smoothness: BC 2450, Profile Report for Pavement Smoothness: BC 2448A, Project Labor Agreement (PLA) Workforce Participation Quarterly Reporting Form: BC 820, Report of Bridge Deck Patching Quantities: BC 2544, Request for Approval of Subcontractor: BC 260a, Request for Procurement Policy Board Waiver: BC 24, Rotational Capacity Test Worksheet: BC 2320, Smoothness Assessment Worksheet: BC 2448B, Subcontractor Payment Agreement: Non-DBE: BC 2115, Substance Abuse Prevention Program Certification: BC 261, Traffic Control Surveillance Report: BC 2240, Geotechnical Memos and Special Provisions, Construction Inspector Daily (QA) Report, BBS 2562, Construction Inspector Project Start Up Checklist, BBS 2561, Pre-Project Environmental Submittal Review Checklist, BBS 2557, Pre-Project Painting Submittal Review Checklist, BBS 2558, Fabrication Nonconformance Report, BBS 2660A, Drilled Shaft Concrete Placement Log, BBS 135, Drilled Shaft Excavation and Inspection Record, BBS 134, Drilled Shaft Qualifications and Installation Plan, BBS 133, Soils Field Testing and Inspection-STTP-S33, Drilled Shaft Foundation Construction Inspection Reference Manual - STTP-S32, Asbestos Determination Certification, BBS 2536, Acceptance Testing for Density Bituminous Mixes: AER 1, Acceptance Testing for Strength 501 Concrete Mixes: AER 3, Aggregate Moisture Determination Pyncometer Jar Test: AER 19, Assignment of Material Description: AER 5, Authorization of Contract Changes: AER 51, Bituminous Mixture Daily Plant Output: AER 9, Bituminous Nuclear Density Testing: AER 16, Concrete Batch Weight Calculations/Field Gradations (Blended Aggregates): AER 12A, Concrete Batch Weight Calculations: AER 12, Concrete Moisture Determination Adjusted Oven Dry Method: AER 6, Concrete Plant Production Mix Veri&cation: AER 4, Construction Phase Engineering Amendment Application: AER 2020, Consultant Airport Construction Personnel Plan: AER 34, Contract Time Suspension/Resumption Noti&cation: AER 1016, Contractor's Performance Evaluation: AER 1777, Hot Mix Asphalt (HMA) Paving Daily Record: AER 2529, Mean and Standard Deviation Test for Outliers: AER 2, PCC Test Batch Documentation Report: AER 23, Storm Water Pollution Prevention Plan/Erosion Control Inspection Report: AER 2259, Airport Construction Documentation Manual, Manual for Documentation of Airport Materials, Policy Memorandum (Aeronautics) 87-3 Mix Design Test Batch Quality Control and Acceptance Testing of PCC Pavement Mixture (2020), Policy Memorandum (Aeronautics) 87-4 Determination of Bulk Specific Gravity (d) of Compacted Bituminous Mixes (2020), Policy Memorandum (Aeronautics) 96-1A Item 610, Structual Portland Cement Concrete, Job Mix Formula Approval and Production Testing (2022), Policy Memorandum (Aeronautics) 96-3 Requirements for Quality Assurance on Projects with Bituminous Concrete Paving (2020), Policy Memorandum (Aeronautics) 97-2 Pavement Marking Acceptance (2020), Policy Memorandum (Aeronautics) 2001-1 Requirements for Cold Weather Concreting (2020), Policy Memorandum (Aeronautics) 2003-1 Requirements for Laboratory, Testing, Quality Control and Paving of Superpave HMA Concrete Mixtures for Airports (2020), Policy Memorandum (Aeronautics) 2011-1 Requirements for Laboratory, Testing, Quality Control, and Paving of Porous Friction Course (2020), Policy Memorandum (Aeronautics) HMA Comparison Samples (2020), Policy Memorandum (Aeronautics) 07-21 Acceptance Procedure for Finely Divided Minerals used in Portland Cement Concrete and Other Applications, Policy Memorandum (Aeronautics) 2001-1 Requirements for Cold Weather Concreting, Policy Memorandum (Aeronautics) 2003-1 Requirements for Laboratory, Testing, Quality Control, and Paving of Superpave HMA Concrete Mixtures for Airports, Policy Memorandum (Aeronautics) 2011-1 Requirements for Laboratory, Testing, Quality Control, and Paving of Porous Friction Course, Policy Memorandum (Aeronautics) 87-2 Density Acceptance of Bituminous Pavements, Policy Memorandum (Aeronautics) 87-3 Mix Design, Test Batch, Quality Control, and Acceptance Testing of PCC Pavement Mixture, Policy Memorandum (Aeronautics) 87-4 Determination of Bulk Specific Gravity (d) of Compacted Bituminous Mixes, Policy Memorandum (Aeronautics) 90-1 Resampling and Retesting of PCC Pavement, Policy Memorandum (Aeronautics) 95-1 Field Test Procedures For Mixer Performance and Concrete Uniformity Tests, Policy Memorandum (Aeronautics) 96-1 Item 610, Structural Portland Cement Concrete: Job Mix Formula Approval & Production Testing, Policy Memorandum (Aeronautics) 96-3 Requirements for Quality Assurance on Projects with Bituminous Concret Paving, Policy Memorandum (Aeronautics) 97-2 Pavement Marking Paint Acceptance, Policy Memorandum (Aeronautics) Comparison Samples, Policy Memorandum (Aeronautics) 22-1 Cement Type, Policy Memorandum (Aeronautics) 22-2 Obtaining Approved Aggregates Complying with 2020 Aeronautics Specifications, Authorization of Contract Changes (Local Let): AER 51L, 2012 Standard Specifications for Construction of Airports, 2020 Standard Specifications for Construction of Airports, Affidavit of Benefcial Interest: AER 2465, Claim for Incidental Expenses for Acquired Property (Residential): AER 606, Claim for Moving Expenses Residential (49 CFR 24.301): AER 2518, Claim for Relocation Payments - Nonresidential: AER 2520, Complete Release of Mortgage (by Corporation): AER 2486, Complete Release of Mortgage (by Individual): AER 2487, Dwelling Inspection (Decent, Safe and Sanitary): AER 2521, Economic Means Evaluation for Low Income Households (Rental Assistance): AER 2525, Limited Approval to Transfer Real Estate: AER 2500, MIDP Computation Using TI Business Analysts or Radio Shack EC-100: AER 2528, Mortgage Interest Differential Payments: AER 2526, Moving Expenses Worksheet - Residential: AER 2518B, Payment Evaluation Form for Replacement Housing Supplement (Purchase): AER 2522, Payment Evaluation Form for Replacement Housing Supplement (Rent): AER 2524, Relocation Assistance Parcel Check List: AER 2517, Relocation Assistance Unit Record: AER 2516, Relocation Plan Interview (Business): AER 2515, Relocation Plan Interview (Residential): AER 2514, Replacement Housing Supplement Certification: AER 2530, Replacement Housing Supplement Comparable Listing: AER 2523, Request for Determination of Entitlement for Payment in Lieu of Moving Expenses: AER 2519, Residential Moving Expense and Dislocation Fixed Payment Schedule: AER 2518A, Utility Subordination Agreement: AER 2490, CATEX FormNotice of Proposed Const.
Hunting Snake Gaiters,
Waste Management Open Attendance 2022,
Housing Association Houses To Rent Leicester,
Articles I